Lifting solutions

We have developed a patent applied for lifting clamp for the safe, easy installation of our Europanel™, Rockspan™, Firemaster™ (Horizontally laid) and Rainspan™ range of composite cladding panels, when laid horizontally.

The combined SWL of a pair of clamps is 500kg; so a pair can safely lift the longest composite panels that Eurobond currently supply. The clamps work by gripping the flanges on the top of the panel by means of a cam and wedge mechanism. A half turn of the actuating lever is all that is required to lock the clamp onto the composite cladding panel. 

Safety features include a spring loaded pin that holds the cam in the locked position, a mechanism that tightens the grip on the composite cladding panel during lifting and in the unlikely event that there is a failure of the composite panel or the clamp, a set of safety strops are included to prevent the insulated composite panel from falling.

Image4

The Benefits of Mechanical Handling Techniques

  • Increased productivity - realistic installation of up to 2000m2 of composite panel a day
  • Full compliance with H&S and CITB due to the removal of manual handling on site
  • Time savings - being able to install 2000m2 of insulated composite panel a day allows for earlier project completion, meaning contractors are able to complete more projects in a year
  • Significant labour cost savings are provided, through reduced labour and faster completion on site
  • Reduced damage to composite cladding panels on site

Composite Panel Clamp Components

PLC With Straps

  • 3m spreader beam
  • Set of safety strops
  • 2 clamps
  • Safety chain
  • D shackles
  • Delivered in a toolbox

Each clamp is CE marked and comes with an instruction booklet.

 

CPDs

See details of our
fire & environmental CPDs

Brochures

Browse and
download our
product brochures

Project gallery

View an interactive
map of projects
using Firemaster

Contact us

Wentloog Corporate Park, Cardiff, CF3 2ER

E: sales@eurobond.co.uk
T: +44 (0) 2920 77 66 77